Italy - reconstruction of the original HPP from 1988.

Bruni
Bruni

Project review

This project included feasibility study of rehabilitation of hydropower plant Bruni. It was focused mainly on technological equipment. The study focused on design of new turbogenerator unit.

Installation of the twin-jet Pelton turbine with a synchronous voltage generator and fully automated operation for each power plant was recommended to the client. The specific needs for extremely low noise and vibrations were respected.

Provided services

HYDROPOL delivered a feasibility study and prepared design for this Italian hydropower plant rehabilitation.

Main data

Country:Italy
Built (year):1988
Output (kW):1 × 870
Head (m):175
Capacity (m3/s)0.18
Completion (year):2008