Glen Duror

United Kingdom - rehabilitation of the turbine and replacement of the electrical control system.

Glen Duror
Glen Duror

Provided services

HYDROPOL provided rehabilitation of the turbine and replacement of the electrical control system and is responsible for maintenance and operation of the plant.

Main data

Country:United Kingdom
Built (year):1998
Output (kW):690
Head (m):90
Capacity (m3/s)1.08
  • Glen Duror
  • Glen Duror