Glenridding
United Kingdom - rehabilitation of the turbine and replacement of the electrical control system.
Provided services
HYDROPOL provided rehabilitation of the turbine and replacement of the electrical control system and is responsible for maintenance and operation of the plant.
Main data
Country: | United Kingdom |
Built (year): | 1992 |
Output (kW): | 500 |
Head (m): | 130 |
Capacity (m3/s) | 0.495 |