Pena

FYR Macedonia - reconstruction of the original plant from 1940.

Pena
Pena

Project review

The HPP Pena is utilizing head of the snow-fed Pena River in a border area of peaks reaching over 2 700 m above sea level. It was already modernized in 1970s but during the construction works improper turbines were used.

The rehabilitation consisted of output and capacity increase by 20%, replacement of the turbine and generators, installation of new substation, automation, and minor civil structures modifications.

Provided services

HYDROPOL was responsible for complete rehabilitation process, e.g. complex research, study and design, delivery of electromechanical equipment and necessary civil works, quality supervision, legal framework, and full project management.

Main data

Country:FYR Macedonia
Built (year):1940
Output (kW):3 280
Head (m):72
Capacity (m3/s)1 × 2.1 × 3
Completion (year):2007