Timis Trei Ape
Romania - reconstruction of the original plant from 1970.
Provided services
HYDROPOL was responsible for permitting, design, EPC contract, technology equipment, maintenance and operation of this project.
Main data
Country: | Romania |
Built (year): | 1970 |
Output (kW): | INPUT 2 × 850 |
Head (m): | 212 |
Capacity (m3/s) | 2 × 0.3 |
Completion (year): | 2013 |